Aim and Objective The aim of this project is to prepare transmigration settlement location which is unimpeded from problems such as puddle and flood in order supporting transmigration in carrying out provided land yard and production yard, so the increment of living quality can be realized. While the objective of this work is to prepare technical plan for drainage/water control at transmigration settlement location, prepare tender document for implementation of integrated physical construction, so optimization of investment and technical and economical implementation stages can be realized