Technical Support Project for Design of Center Transmigration Settlement and Infrastructure  Package B-6

Technical Support Project for Design of Center Transmigration Settlement and Infrastructure  Package B-6

Aim and Objective The aim of this project is to prepare transmigration settlement location which is unimpeded from problems such as puddle and flood in order supporting transmigration in carrying out provided land yard and production yard, so the increment of living quality can be realized. While the objective of this work is to prepare technical plan for  drainage/water control at transmigration settlement location, prepare tender document for implementation of integrated physical construction, so optimization of investment and technical and economical implementation stages can be realized

At Glance:

Status:

Complete

Location:

Air Selagan SP.8 Bengkulu Province

Client:

Ministry of Transmigration, Dirjen Permukiman Direktorat Bina Program, Pimpro Dukungan Teknis Perencanaan Pemukiman dan Prasarana Transmigrasi Pusat.

Period:

July 1997 -15 December 1997

Project Reference Number:

APBN TA 1997- 1998

Other Projects and Experiences

Capacity Building to Support Operational Sustainability of Regional Water System “Wosusokas”
National Urban Development Strategy (NUDS)
Tourism Development Program Management Support
Project Management Support (PMS) for National Urban Development Project (NUDP)
Penyusunan Materi Teknis dan Ranperkada RDTR di Kabupaten Tabalong
Peningkatan Kapasitas Aparatur Pemerintahan Desa dan Pengurus Kelembagaan Desa Provinsi Sulawesi Selatan

Have a query?

Get in touch with us, we will be happy to help.