The purpose of this activity was compiling PUPR infrastructure and other (non-PUPR) strategic infrastructure development plan and program in Kedungsepur Urban Area, which was integrated in inter-sector, inter-region, and inter-level of government based on long-term (10 year), mid-term (3-5 year), and short-term (1-3 year) needs.

The scope of this work at least encompassed:

  1. Preparation:
    • Expert and supporting staff mobilization;
    • Work plan preparation;
    • Methodology sharpening;
    • Data and survey design requirements stock-taking;
    • Initial study of urban area infrastructure development concept based on literature and practical experience of other succeeding countries;
    • Collection of initial data on planned region.
  2. Implementation of the survey by optimizing secondary and primary data when needed:
    • Collection of secondary on various related institutions;
    • Collection of primary data to complete secondary data availability;
    • Collection of policy documents/prior studies related to similar work;
    • Procurement of images and map processing;
    • Data processing and structuring;
  3. Analysis of PUPR infrastructure development requirements that support urban area:
    • Analysis on national policy (basis policy), province, and district/city related in urban area development such as RPJP 2005-2025, RPJMN 2015-2019, Island/Islands Spatial Plan, Province RTRW, District/City RTRW;
    • Analysis on area position in regional constellation;
    • Analysis of all urban physical/morphology embodiment that is built environment including PUPR and non PUPR infrastructures, also the city form and structure, and the growth trend;
    • Analysis on strategic/prioritized area/sub area potency, both the economic and social capital infrastructure potencies and determination of strategic/prioritized area/sub area;
    • Analysis of Regional Development Direction;
    • Analysis of Carrying Capacity and the Capacity;
    • Analysis on Demography and Spatial Intensity;
    • Analysis on Infrastructure Development Requirement Stipulation;
    • Analysis on Program Integratedness and Infrastructure Development Synchronization; and
    • Analysis on Financing Source and Economic/Investment Feasibility.
  4. Formulation of development plan together with policy and indication of PUPR infrastructure development program. Formulation of Policy and Strategy;
    • Formulation of Strategic/Priority Area/Sub Area;
    • Determination and Stipulation of Key Performance Index (KPI); and
    • Compilation of Area PUPR Infrastructure Development Plan and Program Indication.
  5. GIS Spatial Database Management System Computer Program Package.
  6. Formulation of Pre-DED in Priority Area together with the 3D design.

At Glance:

Status:

Complete

Location:

Kedungsepur Area

Client:

Regional Infrastructure Development Agency, Center for Urban Area Development, Kem PUPR Jl. Pattimura No. 20 Kebayoran Baru Jakarta Selatan

Period:

15 June 2015 - 14 December 2015

Project Reference Number:

APBN TA 2015

Other Projects and Experiences

Capacity Building to Support Operational Sustainability of Regional Water System “Wosusokas”
National Urban Development Strategy (NUDS)
Tourism Development Program Management Support
Project Management Support (PMS) for National Urban Development Project (NUDP)
Penyusunan Materi Teknis dan Ranperkada RDTR di Kabupaten Tabalong
Peningkatan Kapasitas Aparatur Pemerintahan Desa dan Pengurus Kelembagaan Desa Provinsi Sulawesi Selatan

Have a query?

Get in touch with us, we will be happy to help.