Pekerjaan Penyusunan Rencana Tata Bangunan dan Lingkungan Pusat Pertumbuhan/KTM (Mesuji Provinsi Lampung)

Pekerjaan Penyusunan Rencana Tata Bangunan dan Lingkungan Pusat Pertumbuhan/KTM (Mesuji Provinsi Lampung)

Data collection survey encompasses administrative area; physiographic; demography; economy and finance; availability of basic infrastructures and facilities; land usage; spatial allotment; disaster-prone area; and basic map of topography and thematic maps required including land usage map, spatial allotment map, and disaster-prone area map; Data collection was undertaken through interview, questionnaire distribution and visit to the institutions; Collection of soil sample and laboratory analysis, to support the analysis of land suitability and land carrying capacity; Data processing and analysis: the technique of environment supporting capacity and carrying capacity that was determined through strategic environment study; and the technique of inter-district area interrelatedness analysis; produce forecasting; Formulation of the choices of development scenario; 6). Formulate sectoral spatial plan and development; 7). Formulate spatial and secctoral development programs; Formulation of plan conception, formulation of the choices of development scenario; 6). formulation of spatial plan and sectoral development; formulation of spatial and sectoral development programs; Spatial Plan Content encompasses spatial structure plan and spatial pattern plan, that is: spatial structure plan encompasses settlement center system plan and infrastructure network system plan and spatial pattern plan encompasses allotment of protection area and cultivation area

At Glance:

Status:

Complete

Location:

Mesuji Lampung Province

Client:

Directorate Technical Planning of Community and Area Development, Directorate General Community and Transmigration Area Development Guidance, Ministry of Man Power and Transmigration Jl. TMP Kalibata No. 17 Jakarta Selatan 12750 Telp. 021 7989912-7989919

Period:

23 April 2012 - 23 August 2012

Project Reference Number:

APBN TA 2012

Other Projects and Experiences

Capacity Building to Support Operational Sustainability of Regional Water System “Wosusokas”
National Urban Development Strategy (NUDS)
Tourism Development Program Management Support
Project Management Support (PMS) for National Urban Development Project (NUDP)
Penyusunan Materi Teknis dan Ranperkada RDTR di Kabupaten Tabalong
Peningkatan Kapasitas Aparatur Pemerintahan Desa dan Pengurus Kelembagaan Desa Provinsi Sulawesi Selatan

Have a query?

Get in touch with us, we will be happy to help.