Penyusunan Rancangan Perpres RTR KSN Taman Nasional Ujung Kulon (MY)

Penyusunan Rancangan Perpres RTR KSN Taman Nasional Ujung Kulon (MY)

Theobjective of this project was the compilation of Raperpres RTR KSN Ujung Kulon National Park that has been agreed upon by the district, provincial governments and related ministry/institution.

The scope of this project activity encompassed:

Stage 1 (year 2012: 7 months)

  1. Undertake literature study on legislation and studies related to the area
  2. Identify and determine the area strategic values
  3. Identify the area strategic issues and determine area delineation
  4. Agreement upon area initial delineation with regional government.
  5. Procurement and preparation of work map in digital form (topographic map and satellite image and the interpretation)
  6. Undertake site survey and data collection
  7. Undertake analysis on related aspects to determine KSN spatial planning policy direction
  8. Undertake initial study related to KLHS compilation, with at least undertaking (base line data together with field survey; Undertake analysis of base line data; Formulate environment strategic issues; Undertake consultancy with related stakeholders; Provide input to KSN development concept)
  9. Formulation of the objective, policy and strategies of KSN spatial planning
  10. Formulation of KSN spatial structure plan and spatial pattern plan
  11. Preparation of thematic map including spatial pattern plan and spatial structure maps.
  12. Compilation of initial draft raperpres
  13. Compilation of draft RTR KSN technical material
  14. Undertake consignment in Jakarta in the view of determining spatial planning policy direction and formulation of spatial plan content.
  15. Undertake focused discussion (FGD) in Jakarta and discussion in the region in the view of agreement upon strategic issues and area delineation, spatial planning policy direction, and spatial plan content.
  16. Undertake focused discussion and explore the input related to strategic issues and area delineation.

Stage 2 (year 2013: 9 months)

  1. Agreement upon KSN development concept
  2. Formulation of spatial usage direction containing program indication
  3. Formulation of control direction
  4. Undertake the study and formulate KSN institutional concept
  5. Accomplishment of RTR KSN technical material
  6. Compilation of raperpres RTR KSN
  7. Agreement upon RTR KSN technical material with regional government
  8. Discussion and agreement upon the attachment map content with related sectors and regional government
  9. Cross-sector discussion on draft President Regulation (Raperpres) of RTR KSN with government institution (BKPRN) and head of region to obtain substance agreement
  10. Compilation KLHS documents with at least undertake (in-depth analysis on environment strategic issues), formulate mitigation on environment strategic issues related with spatial plan concept, and formulate the recommendation
  11. Printing of map album and preparation of RTR KSN attachment maps in the form of State Gazette
  12. Undertake consignment in Jakarta in the view of spatial plan content accomplishment, accomplishment of Raperpres technical material, attachment map discussion, and compilation of KLHS documents.
  13. Undertake focused discussion (FGD) in Jakarta in the view of discussing KSN institutional aspects.
  14. Undertake discussion in the region in the view of agreement upon RTR KSN material and attachment map content.
  15. BKPRN meeting in the view of discussing and agreement upon RTR KSN content in Jakarta.

At Glance:

Status:

Complete

Location:

Ujung Kulon National Park

Client:

Work Unit National Area Development, Directorate General Spatial Planning, Ministry of Public Work Jl. Pattimura No. 20 Kebayoran Baru - Jakarta Selatan

Period:

10 May 2012 - 08 September 2013

Project Reference Number:

APBN TA 2012-2013

Other Projects and Experiences

Capacity Building to Support Operational Sustainability of Regional Water System “Wosusokas”
National Urban Development Strategy (NUDS)
Tourism Development Program Management Support
Project Management Support (PMS) for National Urban Development Project (NUDP)
Penyusunan Materi Teknis dan Ranperkada RDTR di Kabupaten Tabalong