The purpose of this activity was compiling PUPR infrastructure and other (non-PUPR) strategic infrastructure development plan and program in Kedungsepur Urban Area, which was integrated in inter-sector, inter-region, and inter-level of government based on long-term (10 year), mid-term (3-5 year), and short-term (1-3 year) needs.
The scope of this work at least encompassed:
- Preparation:
- Expert and supporting staff mobilization;
- Work plan preparation;
- Methodology sharpening;
- Data and survey design requirements stock-taking;
- Initial study of urban area infrastructure development concept based on literature and practical experience of other succeeding countries;
- Collection of initial data on planned region.
- Implementation of the survey by optimizing secondary and primary data when needed:
- Collection of secondary on various related institutions;
- Collection of primary data to complete secondary data availability;
- Collection of policy documents/prior studies related to similar work;
- Procurement of images and map processing;
- Data processing and structuring;
- Analysis of PUPR infrastructure development requirements that support urban area:
- Analysis on national policy (basis policy), province, and district/city related in urban area development such as RPJP 2005-2025, RPJMN 2015-2019, Island/Islands Spatial Plan, Province RTRW, District/City RTRW;
- Analysis on area position in regional constellation;
- Analysis of all urban physical/morphology embodiment that is built environment including PUPR and non PUPR infrastructures, also the city form and structure, and the growth trend;
- Analysis on strategic/prioritized area/sub area potency, both the economic and social capital infrastructure potencies and determination of strategic/prioritized area/sub area;
- Analysis of Regional Development Direction;
- Analysis of Carrying Capacity and the Capacity;
- Analysis on Demography and Spatial Intensity;
- Analysis on Infrastructure Development Requirement Stipulation;
- Analysis on Program Integratedness and Infrastructure Development Synchronization; and
- Analysis on Financing Source and Economic/Investment Feasibility.
- Formulation of development plan together with policy and indication of PUPR infrastructure development program. Formulation of Policy and Strategy;
- Formulation of Strategic/Priority Area/Sub Area;
- Determination and Stipulation of Key Performance Index (KPI); and
- Compilation of Area PUPR Infrastructure Development Plan and Program Indication.
- GIS Spatial Database Management System Computer Program Package.
- Formulation of Pre-DED in Priority Area together with the 3D design.