Bantuan Teknis Penyusunan RDTR Kawasan di Sekitar TOD Kereta Api Cepat Jakarta – Bandung

Bantuan Teknis Penyusunan RDTR Kawasan di Sekitar TOD Kereta Api Cepat Jakarta – Bandung

To support the government in preparing RDTR and Zoning Regulations for areas surrounding the Jakarta-Bandung High-Speed Rail TOD zones.

Key Activities Includes:

  • Preparation Phase: Set up the workspace (studio), define methodology and work plan; Conduct desk study and prepare for field surveys.
  • Initial Coordination: Central-level coordination with local technical teams for BWP (Planning Area) delineation and work planning.
  • Base Map Development: Acquire high-resolution satellite imagery; Conduct GCP, ICP, and toponymy surveys; Perform orthorectification, geometric accuracy testing, and digitization.
  • Data Collection. Collect primary and secondary data through desk studies and field surveys: For base maps (min. scale 1:5000): satellite imagery, survey results, DEM, and accuracy tests; For thematic maps: administrative boundaries, physiography, demographics, economy, infrastructure, land use, and environmental quality; Institutional and legal framework data.
  • Spatial Analysis (per MPWH Regulation No. 20/2011): Analyze regional characteristics: spatial roles, interconnectivity, physical and socio-economic features, disaster vulnerability, and fiscal capacity; Assess development potential and spatial issues: space needs and land use changes; Evaluate environmental and regional performance.
  • Coordination with BIG: Consult with the Geospatial Information Agency (BIG) to obtain recommended maps.
  • Formulation of Planning Concepts: Define objectives, spatial structure and pattern plans, infrastructure networks, zoning regulations, and prioritized sub-BWP areas for RTBL (Urban Design Guidelines).
  • Stakeholder Engagement: Organize workshops, FGDs, and public consultations; Present and expose RDTR and PZ drafts; Compile a comprehensive report of the entire process.

At Glance:

Status:

Complete

Location:

Teluk Jambe Karawang- Tegalluar Bandung

Client:

Jenderal Tata Ruang, Kementerian Agraria dan Tata Ruang / BPN

Period:

31 March 2017 - 29 November 2017

Project Reference Number:

APBN TA 2017

Other Projects and Experiences

Capacity Building to Support Operational Sustainability of Regional Water System “Wosusokas”
National Urban Development Strategy (NUDS)
Tourism Development Program Management Support
Project Management Support (PMS) for National Urban Development Project (NUDP)
Penyusunan Materi Teknis dan Ranperkada RDTR di Kabupaten Tabalong
Peningkatan Kapasitas Aparatur Pemerintahan Desa dan Pengurus Kelembagaan Desa Provinsi Sulawesi Selatan

Have a query?

Get in touch with us, we will be happy to help.